Projects

Client
Port of Seattle (SEA)

Project
Baggage Optimization Project Ph2 - Airline Technical Representation

The baggage optimization project replaces 6 individual baggage screening systems with a centralized system that optimizes the operation of the checked baggage system at SEA. The project will optimize the baggage handling system to achieve the maximum outbound baggage capacity within the current airport footprint.

Client
United Airlines

Project
Denver International Airport (DEN) United Airlines Clubs

  • Concourse A West

  • Concourse B East

  • Concourse B West

  • United Club Fly

  • Starbucks

Client
Los Angeles World Airports (LAWA)

Project
Terminal 4/5 Modernization Program

Reconstruction of Terminal 4 east headhouse and new south concourse to feature new ticketing counters and baggage claim carousels for American Airlines and a consolidated TSA Security Screening Checkpoint. The new south concourse will feature additional space for hold rooms, concessions, restrooms, and a bus gate that will serve both domestic and international flights.

Client
Plaza Premium Group

Project
Concourse A Plaza Premium / Capital One Lounge

A single-level 10,000 square foot Lounge, opened to the public November 2023

  • Completed odd size bag inputs in check-in pods B and G

  • Completed Level 3 makeups to support airline relocations

  • Completed 2nd Individual Carrier System (ICS) in North America

Client
Denver International Airport (DEN)

Project
Baggage Handling Projects

Client
Denver International Airport (DEN)

Project
Baggage Handling System (BHS) Level 3 MOD 1E-2E Crossover

  • Added Post Screening Crossover conveyor belts connecting Mod 1 & 2 East in the Terminal

  • 2 brand new baggage makeup units

  • 4 existing baggage makeup units consolidated into 2 larger units to support airline growth

Client
Denver International Airport (DEN)

Project
Gate Apron Rehabilitation and Drainage Improvement (GARDI)

  • 5 apron gates on Concourse A

  • Replace gate apron pavement section

  • Correct Ponding, heaving, cracking, slope issues

  • Provide pavement drainage (surface & subsurface)

  • New drainable base layer drains to new DIW trench drains

  • Replace existing utilities (storm, sanitary, water, electrical), manholes, hydrant fueling pits

  • Includes Runway 17L-35R, parallel TW P, TW EA, TW EC, TW ED, and all connecting/high speed taxiways up to the hold bar

  • Approximately 1,150 25ftx25ft panels to be removed on the runway

  • Over 2,000 lights upgraded to LEDs on runway and connecting taxiways

  • Over 440,000 LF of pavement markings removed and reapplied

  • 64 runway and taxiway signs replaced

Client
Denver International Airport (DEN)

Project
17L-35R Runway Rehabilitation

  • Complete renovation of existing United Club near gate C74

  • The opening brings additional lounge capacity to one of the airline’s busiest hubs in the system

Client
Newark Liberty International Airport (EWR)

Project
C1 United Club Renovation

Let’s Work Together

Interested in working together?
Fill out some info and we’ll be in touch shortly! We can't wait to hear from you!